SOME PAST PROJECTS

Surprisingly we're not professional photographers! So the pictures you see here aren’t the best quality, and usually taken with a smart phone. This section looks to show you some completed projects and work in progress photos.

Centrica Servery
Drewmark Windsor 2017 -2
Drewmark Windsor 2017 -19
Drewmark Windsor 2017 -18
Drewmark Windsor 2017 -20
Drewmark Windsor 2017 -31
Drewmark Windsor 2017 -25
Drewmark Windsor 2017 -29
Drewmark Windsor 2017 -12
Drewmark Windsor 2017 -11
Drewmark Windsor 2017 -17
Drewmark Windsor 2017 -14
Drewmark Windsor 2017 -22
Drewmark Windsor 2017 -21
Drewmark Windsor 2017 -23
Drewmark Windsor 2017 -3
Drewmark Windsor 2017 -33
Drewmark Windsor 2017 -36
Drewmark Windsor 2017 -4

Centrica Windsor


This project saw the team remove the old, and create a new canteen for Centrica’s head office in Windsor. 


Amongst other things we were responsible for:

  • Partitioning.
  • Feature ceilings and bulkheads.
  • All carpentry.
  • Temporary site services.
  • Feature walls.
  • Ceramic tiling.
  • Joinery.
20230201_073829
IMG-20230323-WA0006 redacted
20230403_133956
IMG-20230307-WA0005

Luxury Bathroom Refurbishment


A recent project in a large country house where five toilets and bathrooms were refurbished. The old bathrooms were completed stripped back to brickwork and joists, joisting repaired and services added. Our team undertook all the carpentry, drylining, joinery fitting and helped manage the site.


IMG_9257
IMAG0217
IMAG0227
IMAG0218
IMAG0234
IMAG0235
IMAG0238
IMAG0240
IMAG0249
IMAG0252
IMAG0253
IMAG0258
IMAG0269
IMAG0273
IMAG0276
IMAG0277
IMAG0280
IMAG0297_BURST002
IMAG0301
IMAG0303
IMAG0306
IMAG0307
IMAG0315
IMAG0326
IMAG0327
IMAG0332
IMAG0334
IMAG0336
IMAG0337
IMAG0341
IMAG0344
IMG_9213
IMG_9242

UNIVERSITY OF WEST LONDON - BASEMENT STUDIO'S


The brief from the designer and client here was "can you create a high-end facility with four acoustically isolated rooms, manage all the different trades and specialists, and have the project complete in 8 weeks?" The project was completed on time within budget and with a snag free handover.


This project was a real challenge, working as part of a larger scheme of construction and under the direct supervision of a nationwide main contractor our specialist team was able to satisfy all the main contractor obligations and achieve our strict deadline.


Studio builds have a visibly disproportionate volume of materials used when the size of the final space is considered. Tons of materials went into this build all moved by hand with limited head height and space. We were limited to the footprint of the final studios area as working space, meaning careful management was needed to ensure efficient working and no damage to final finishes.

20210923_122733_resized

WAG Entertainment


An example here of a small job we've completed lately, installing a static control access floor in preparation for a new server room.



We were called in with very short notice and had the work started and complete within the very tight schedule.


Whilst we do undertake larger projects, no project is too small!

live2
20170608_131427
20170621_103107
20170621_103110
20170812_145726
20170812_145734
20170726_134738
DSC00815
DSC00798
DSC00765
DSC00744
IMG_8238
DSC00747
DSC00743
DSC00761 2-1
DSC00747-1

University of Winchester


Our team successfully created the recording, live and editing spaces for the university's new course designed to use them.


As you can see from the pictures the area was originally a large dance studio.

The team built all the acoustic partitions, made and fitted all the finishes, made and fitted all the acoustic windows, and facilitated all the other trades in their work.


Along with the above we also:

  • Built the Studio Managers office with glass frontage and plasterboard partitioning.
  • Installed reception area feature walling.
  • Decorations, plastering and tape and jointing.
  • Site management.
  • Temporary site facilities.
  • Built a plant area above the studios.
  • Created a 'Green Room' area.
  • Provided joinery and all carpentry.


virgin4
virgin5
virgin3

Virgin Healthcare


This project was some time ago, working for a main contractor our team helped create a inspiring workspace for a new Virgin team. With a close working relationship with the design team, their vision was realised on time and within budget.


We undertook:

  • All carpentry including doors, skirtings & architraves and tea points.
  • Glazed partitioning.
  • Feature bulkheads and ceilings.
  • Corian reception desk.
  • Joinery.
  • Temporary site services.